  • Obtain competitive unit prices for all labor, material and equipment necessary for pigging an existing sanitary sewer force main.
  • The work includes pigging and disposal of the wastewater sewage and sludge from the force main system.
  • Immediately following the pigging operations, and prior to starting the lift station, the work by the contractor shall include installation of one new check valve inside an existing manhole adjacent to the lift station pump vault.
  • The contractor shall replace, with new, the existing AR/AV valve inside the vault location at the intersection of Coffman Road and Hookless Boulevard in Whitewater, Colorado.